top of page

Main Bridge:

  • Design Phase

  • Replacement of San Elijo Bridge on I-5 

  • Construct HOV Lanes

    • Widening and lengthening 

  • Design Temporary Structures to Assist Construction 

  • Design Main Span 

  • Provide CAD Drawings and Structural Calculations

    • Bridge layout and details

  • Greenroads

  • Construction Phase 

​
 

©2021 by OPTIMA GROUP. Powered by Wix.com

bottom of page